Last Updated On: Fri Aug 28 2026Time and work questions measure how quickly people, machines, or pipes complete a task. The key is to convert every statement into a rate of work and combine those rates correctly.
Basic work concept
Treat the complete task as one unit of work. If a person finishes a task in n days, that person's one-day work is 1/n of the task. The time required is the reciprocal of the daily work rate.
- If A completes a job in 10 days, A's daily work is 1/10.
- If A completes 1/10 and B completes 1/15 each day, together they complete 1/10 + 1/15 = 1/6 per day.
- Therefore, together A and B complete the job in 6 days.
Work, rate, and time
- Work = Rate x Time
- Rate = Work / Time
- Time = Work / Rate
- For the same job, efficiency is inversely proportional to time.
Combined work
Add work rates when people or machines work together. If A takes a days and B takes b days, their combined one-day work is 1/a + 1/b. Their combined time is ab/(a + b) days.
When one worker leaves or joins partway through the task, calculate the work completed in each period separately and add the parts.
Efficiency and wages
- Efficiency is the amount of work completed in one unit of time.
- If A is twice as efficient as B, A's efficiency ratio to B is 2:1 and their time ratio is 1:2.
- For equal time, work done is proportional to efficiency.
- When workers contribute for the same time, wages are divided in the ratio of work done.
Pipes and cisterns
- An inlet pipe has a positive work rate because it fills the tank.
- An outlet pipe has a negative work rate because it empties the tank.
- Net rate = total inlet rates - total outlet rates.
- Use the same rate method as workers, treating the tank as one unit.
How to solve questions
- Take the whole job or tank as one unit, unless an easier total work value is given.
- Convert each person's or pipe's completion time into a one-day rate.
- Add rates for work done together and subtract outlet rates.
- For changing teams, find work done in each stage before finding the remaining work.
- Check that more workers or higher efficiency gives less time for the same work.